four opening Phototypesetter 2 Installation requirements of dial pointer sensitivity differential setter

1. Space requirements: length ≥ 3.2 meters, width ≥ 2.5 meters, minimum access width 0.7 meters, recommended 0.9 meters

2. Therefore, it can better reflect its advantages in laboratories that continuously do impact experiments and metallurgy, machinery manufacturers and other departments that do a large number of impact experiments. Electrical requirements:

Phototypesetting electromechanical requirements: one AC220V 2kW 10A grounded socket, and it is required to be safely grounded

mechanical and electrical requirements for punching: one AC220V 3KW 15A grounded socket; And it is required that it must be safely grounded

3. Water requirements:

if the tablet punching machine needs to use circulating water, two parallel taps should be installed, and a 90 ° tap should be made under the tap × Water washing

tank about 35cm; A drainage pipe should be made under the washing tank. (if the water quality is not good, it is recommended to add a filter)

4. PC requirements:

install the system Windows 2000 Professional Edition,

mainboard configuration suggestions: ASUS, Saiyang, cpu:p3 or above, memory: ≥ 256M, hard disk: ≥ 40g

5. Arrange training for personnel who understand computer design software and typesetting

6. The imagesetter must be connected to a regulated power supply. Requirements: 3KVA UPS, which can be powered on for about 15 minutes after power failure

7. It is recommended to install air conditioners, and the rooms should be ventilated, dustproof and clean

installation requirements of split Imagesetter

1. Space requirements: length ≥ 3.5 meters, width ≥ 3 The exposed sliding parts, gears, pulleys, etc. of the experimental machine should be protected and installed; 3 meters, the minimum entrance width is 0.8 meters, and it is recommended to be 1.1 meters

2. Electrical requirements:

Phototypesetting electromechanical requirements: one AC220V 2kW 10A grounded socket, and it is required to be safely grounded

mechanical and electrical requirements for punching: one AC220V 4kw 15A grounded socket; And it is required that it must be safely grounded

3. Water requirements:

if the tablet punching machine needs to use circulating water, two parallel taps should be installed, and a 90 ° tap should be made under the tap × Water washing tank about 35cm; A drainage pipe should be made under the washing tank. (if the water quality is not good, it is recommended to add a filter)

4. PC requirements:

install the system Windows 2000 Professional Edition. Suggestions for mainboard configuration: ASUS, Saiyang, cpu:p3 or above, memory: ≥ 256M, hard disk: ≥ 40g

5. Arrange training for personnel who understand computer design software and typesetting

6 it is suggested to pay attention to the thematic investment opportunities brought by the relevant listed companies with new material technology and the gradual promotion of the industrialization of new materials. The imagesetter must be connected to the regulated power supply. Requirements: 3KVA UPS, which can be powered on for about 15 minutes after power failure

7. It is recommended to install air conditioners, and the rooms should be ventilated, dustproof and clean

source: printed in Suzhou

Copyright © 2011 JIN SHI